PERSONAL INFORMATION
Name: --------
Address: --------
E-mail: --------
Contact No. : --------
Date of Birth: --------
Sex : Male
Martial Status: Married
Registered Electrical Workers: W123456
EWRB : Qualified ELECTRICIAN. Current NZ Practicing License E123456
Working Experience
Vocational Training Council
July 2014 – August 2017 – Electrical Instructor
Practical training & Lecture for Electrical apprentice
Teaching Subject:
VBS3003 Electrical installation
VEE3351 Electrical control circuit
VEE2251 Electrical Installation
VOT2006 Safety, Health and Environment
ATAL Data Centre Infrastructure Limited
Sep 2013 – Jun 2014 - Service Engineer
Preventive Maintenance of L.V. System at Hong Kong Exchange & Clearing Limited (HKEx)
Annual Maintenance of H.V. System at Equinix
WR2 submission work of D.G. Store at HKEx
WR2 submission work at Tai Po NTT communication Limited
WR2 submission work at China Light & Power Limited (Shatin Data Centre)
Transport Infrastructure Management Limited
Mar 2010 – Sep 2013 - Technical Supervisor I
- Facilities Management (Tunnel – Tsing Sha Control Area)
H.V. system
L.V. system
UPS system
F.S. system
A/C system
Genset system
BeSpark Technologies Engineering Limited
Feb 2008 – Mar 2010 - Project Engineer
Smartone
- Power Upgrading(800A) for Smartone switching center at MC2
(include CLP Meter application, Design and Build )
- Power Upgrading(800A) for Smartone switching center at Lai Chi Kok (Design and Build)
- Power Upgrading(1200A) for Smartone switching center at Shek Mun (Design and Build)
- Installation of CRAC, Genset
- Troubleshooting
- Power analysis
Singapore Telecom (Hong Kong) Limited
- Power Upgrading(600A) for switching center at Shek Mun (Design and Build)
(include CLP Meter application, Design and Build)
CSL
- Power Upgrading(1600A) for switching center at BPO (Tai Po)
(include CLP Meter application, Design and Build)
- Supply and install Socomec 10KVA UPS (Kowloon Bay)
Emerson network power
- Installation of 4x400KVA UPS at Pak Tin Par Street
- Installation of 8nos. 200KVA Precision Power Center at Pak Tin Par Street
- Modification of Precision Power Center
Mei Chi Engineering Ltd.
Apr 2006- Jan 2008 - Project Engineer
CLPE sub-contractor
- Installation of Harmonic filter & capacitor Bank at Baptist campus
- Replacement of Main Switchboard 2,3 & 4 at Chai Wan Depot Metro Transportations Railway Corporation Limited (MTRC)
- Replacement of Main Switchboard 1 at Tsuen Wan Depot (MTRC)
- Lighting factor simulation at Tsuen Wan Depot(MTRC)
- Design, installation & testing of Sump pump System
- Installation of a Heat pump system for Metropolis Hotel & Grand Standford
- WR2 submission
- Troubleshooting
DCL Communication Ltd.
Aug 2005 – Mar 2006 - Project Engineer(E-Room)
- Project Management, Design, installation & maintenance for UPS system
(Include: UPS, Raise Floor, Monitor System, CRAC, Electrical system, F.S. system)
- Troubleshooting
First Tech Engineering Limited
Jan 2001 - May 2005 - Assistant Engineer
Feb 1996 - Dec 2000 - Technician
Site Inspection, Maintenance, Management and Electrical Design
- Power analysis
- Troubleshooting
- Thermo scanning
- Transformer maintenance
- Wrong circuit tracing
- WR2 submission
1) Danger Goods Store testing and inspection
2) H.V. & L.V. installation, testing and inspection
3) H.V. & L.V. Chiller Starter testing and inspection
Client / Site:
- Modern Terminal Limited
- ATL Logistics center
- Hong Kong International Terminal
- Harbour City
- China Hong Kong City
- Pacific Place II
- Festival Walk
- Dorset House Resident & Industry Building
- Government Pump Room
- Hong Kong Jockey club
- Poly University
K.M.LUK & Engineers Limited
May 1994 - Jan 1996 - Technician
Jul 1993 - Apr 1994 - Electrician
Jul 1990 - Jun 1993 - Electrical Craft Apprentice
inspection, Testing and Installation
- H.V. & L.V. installation, testing and inspection
- 132KV substation Transformer and Ring Main Unit installation, testing, termination and cabling
- Signaling
Service of a corporation:
- Modern Terminal Limited (Testing & Inspection of H.V./L.V. System)
- The Hong Kong Electric (Installation of 132KV RMU & Transformer)
- China Light and Power Hong Kong (Installation of 132KV RMU)
- Tsing Yi Mobil Oil Depot (Installation of L.V. System)
- Hong Kong Jockey club (Signaling)
- MTR Corporation (Signaling)
EDUCATION / PROFESSIONAL QUALIFICATION
Higher Diploma in Electrical Engineering Hong Kong Institute of Vocational Education (Tsing Yi) 2008-2011
Safety Supervisor Training Certificate Hong Kong Institute of Vocational Education (Tsing Yi) 2008
Diploma in Building Services Design, Installation and Maintenance Hong Kong Productivity Council 2001
Certificate of Completion for Auto Cad Training Hong Kong Productivity Council 2000
Certificate in Electrical Engineering Haking Wong Technical Institute 1994-1998
Bridging Course Certificate for Craft Graduates Sha Tin Technical Institute 1992-1994
Certificate of Completion of Apprenticeship Vocational Training Council
K.M.Luk & Engineers Limited 1993
Certificate in Electrical Craft Sha Tin Technical Institute 1990-1992
Electrician / Electrical Fitter Vocational Training Council 1990
Registration of Electrical Worker, Grade H (B0 H0 WH)
Registration of Electrical Worker, Grade A (A0)
Grade A:Up to 400A, B:Up to 2500A, H:High Voltage, WH:Water Heater
0:Incube Design, Installation & Maintenance 2001
1995
https://www.emsd.gov.hk/tc/electricity_safety/registers/registered_electrical_workers/index.html
SKILLS
Microsoft Word, Excel, Relux, Auto Cad and ISO9001 management
English and Chinese Type writing
Understand wiring diagrams
ADDITIONALS
Possess of valid Hong Kong driving licence (1, 2, 3, 18 & 22)
Possess a valid full NZ driver's licence ( Class 1 and 6)
CP Holder for MTRC Year 2006 – 2007 (with Fire Marshal)
Certificate of Safe use of Abrasive Wheels
Certificate of Competence in Display Screen Equipment Assessment
Certificate of Electric Arc Welding Safety
Mobile Source Control Section (EPD certificate)
INTERESTS
Hiking, climbing, Swimming, Diving, and Computing
AVAILABILITY
Available
Name: --------
Address: --------
E-mail: --------
Contact No. : --------
Date of Birth: --------
Sex : Male
Martial Status: Married
Registered Electrical Workers: W123456
EWRB : Qualified ELECTRICIAN. Current NZ Practicing License E123456
Working Experience
Vocational Training Council
July 2014 – August 2017 – Electrical Instructor
Practical training & Lecture for Electrical apprentice
Teaching Subject:
VBS3003 Electrical installation
VEE3351 Electrical control circuit
VEE2251 Electrical Installation
VOT2006 Safety, Health and Environment
ATAL Data Centre Infrastructure Limited
Sep 2013 – Jun 2014 - Service Engineer
Preventive Maintenance of L.V. System at Hong Kong Exchange & Clearing Limited (HKEx)
Annual Maintenance of H.V. System at Equinix
WR2 submission work of D.G. Store at HKEx
WR2 submission work at Tai Po NTT communication Limited
WR2 submission work at China Light & Power Limited (Shatin Data Centre)
Transport Infrastructure Management Limited
Mar 2010 – Sep 2013 - Technical Supervisor I
- Facilities Management (Tunnel – Tsing Sha Control Area)
H.V. system
L.V. system
UPS system
F.S. system
A/C system
Genset system
BeSpark Technologies Engineering Limited
Feb 2008 – Mar 2010 - Project Engineer
Smartone
- Power Upgrading(800A) for Smartone switching center at MC2
(include CLP Meter application, Design and Build )
- Power Upgrading(800A) for Smartone switching center at Lai Chi Kok (Design and Build)
- Power Upgrading(1200A) for Smartone switching center at Shek Mun (Design and Build)
- Installation of CRAC, Genset
- Troubleshooting
- Power analysis
Singapore Telecom (Hong Kong) Limited
- Power Upgrading(600A) for switching center at Shek Mun (Design and Build)
(include CLP Meter application, Design and Build)
CSL
- Power Upgrading(1600A) for switching center at BPO (Tai Po)
(include CLP Meter application, Design and Build)
- Supply and install Socomec 10KVA UPS (Kowloon Bay)
Emerson network power
- Installation of 4x400KVA UPS at Pak Tin Par Street
- Installation of 8nos. 200KVA Precision Power Center at Pak Tin Par Street
- Modification of Precision Power Center
Mei Chi Engineering Ltd.
Apr 2006- Jan 2008 - Project Engineer
CLPE sub-contractor
- Installation of Harmonic filter & capacitor Bank at Baptist campus
- Replacement of Main Switchboard 2,3 & 4 at Chai Wan Depot Metro Transportations Railway Corporation Limited (MTRC)
- Replacement of Main Switchboard 1 at Tsuen Wan Depot (MTRC)
- Lighting factor simulation at Tsuen Wan Depot(MTRC)
- Design, installation & testing of Sump pump System
- Installation of a Heat pump system for Metropolis Hotel & Grand Standford
- WR2 submission
- Troubleshooting
DCL Communication Ltd.
Aug 2005 – Mar 2006 - Project Engineer(E-Room)
- Project Management, Design, installation & maintenance for UPS system
(Include: UPS, Raise Floor, Monitor System, CRAC, Electrical system, F.S. system)
- Troubleshooting
First Tech Engineering Limited
Jan 2001 - May 2005 - Assistant Engineer
Feb 1996 - Dec 2000 - Technician
Site Inspection, Maintenance, Management and Electrical Design
- Power analysis
- Troubleshooting
- Thermo scanning
- Transformer maintenance
- Wrong circuit tracing
- WR2 submission
1) Danger Goods Store testing and inspection
2) H.V. & L.V. installation, testing and inspection
3) H.V. & L.V. Chiller Starter testing and inspection
Client / Site:
- Modern Terminal Limited
- ATL Logistics center
- Hong Kong International Terminal
- Harbour City
- China Hong Kong City
- Pacific Place II
- Festival Walk
- Dorset House Resident & Industry Building
- Government Pump Room
- Hong Kong Jockey club
- Poly University
K.M.LUK & Engineers Limited
May 1994 - Jan 1996 - Technician
Jul 1993 - Apr 1994 - Electrician
Jul 1990 - Jun 1993 - Electrical Craft Apprentice
inspection, Testing and Installation
- H.V. & L.V. installation, testing and inspection
- 132KV substation Transformer and Ring Main Unit installation, testing, termination and cabling
- Signaling
Service of a corporation:
- Modern Terminal Limited (Testing & Inspection of H.V./L.V. System)
- The Hong Kong Electric (Installation of 132KV RMU & Transformer)
- China Light and Power Hong Kong (Installation of 132KV RMU)
- Tsing Yi Mobil Oil Depot (Installation of L.V. System)
- Hong Kong Jockey club (Signaling)
- MTR Corporation (Signaling)
EDUCATION / PROFESSIONAL QUALIFICATION
Higher Diploma in Electrical Engineering Hong Kong Institute of Vocational Education (Tsing Yi) 2008-2011
Safety Supervisor Training Certificate Hong Kong Institute of Vocational Education (Tsing Yi) 2008
Diploma in Building Services Design, Installation and Maintenance Hong Kong Productivity Council 2001
Certificate of Completion for Auto Cad Training Hong Kong Productivity Council 2000
Certificate in Electrical Engineering Haking Wong Technical Institute 1994-1998
Bridging Course Certificate for Craft Graduates Sha Tin Technical Institute 1992-1994
Certificate of Completion of Apprenticeship Vocational Training Council
K.M.Luk & Engineers Limited 1993
Certificate in Electrical Craft Sha Tin Technical Institute 1990-1992
Electrician / Electrical Fitter Vocational Training Council 1990
Registration of Electrical Worker, Grade H (B0 H0 WH)
Registration of Electrical Worker, Grade A (A0)
Grade A:Up to 400A, B:Up to 2500A, H:High Voltage, WH:Water Heater
0:Incube Design, Installation & Maintenance 2001
1995
https://www.emsd.gov.hk/tc/electricity_safety/registers/registered_electrical_workers/index.html
SKILLS
Microsoft Word, Excel, Relux, Auto Cad and ISO9001 management
English and Chinese Type writing
Understand wiring diagrams
ADDITIONALS
Possess of valid Hong Kong driving licence (1, 2, 3, 18 & 22)
Possess a valid full NZ driver's licence ( Class 1 and 6)
CP Holder for MTRC Year 2006 – 2007 (with Fire Marshal)
Certificate of Safe use of Abrasive Wheels
Certificate of Competence in Display Screen Equipment Assessment
Certificate of Electric Arc Welding Safety
Mobile Source Control Section (EPD certificate)
INTERESTS
Hiking, climbing, Swimming, Diving, and Computing
AVAILABILITY
Available
沒有留言:
發佈留言
任何人留有政治言論,個別使用者將會被隔離這個網誌,或留言系統將會被限制,甚至關閉。
所有技術性問題,必須在網誌內進行提問,讓其他人也可以觀看,其他社交軟體一律不作回應,所以不用償試在其他社交軟體尋求一對一的提問。
如果進行匿名留言,有時候系統會當作垃圾訊息,需要審批才會出現,時間上會較遲。